
West Flood Diversion Channel


Design Client: Tehran Municipality – Technical and Engineering Consulting Organization of Tehran Municipality
Supervision Client: Tehran Municipality – Khakrizab Water Company
Objectives of the Project:
Following the significant damages caused by a flood in the largest metro station in the Middle East at the intersection of Lines 1 and 4 in Tehran in 2011, Tehran Municipality took the initiative to upgrade one of the main channels and surface water outlets in Tehran, known as the “Kanal-e Sil Bargardan-e Gharb” (Westward Flood Return Channel). For this purpose, the Environmental Construction Company was engaged to provide consulting
Description of Services:
^
Conceptual studies for the entire length of the channel
^
Basic and detailed design of the damaged sections of the channel
^
Conceptual studies, basic and detailed design of sedimentation basins along the channel
^
Workshop supervision and quality control during the execution of the damaged sections (first priority).