Study of Electric Train for the New City of Sadra

Client: New City of Sadra Development Company

Consulting Services: Preliminary and Detailed Studies (Phase 1 and Phase 2) of the Project

Starting Point of the Line:
H3 Station, Line 3 of Shiraz Metro
Total Length of the Route:
Approximately 13 kilometers in length
End Point of the Line:
Located near Kendu Theme Park
Connection with Other Lines:
Continuation of Line 3 of Shiraz Metro as an integrated route without any passenger transfer
Number of Stations:
3
Time Intervals:
6 minutes
Length of Platform at Stations:
102 meters
Type of Rolling Stock:
Similar to the trains used in Line 1 and Line 3 of Shiraz Metro, with the configuration of Tc-Mp-M-Mp-Tc
Power Supply System Type:
Overhead catenary, 1500 VDC
Number of Trains Required in the Project Horizon (2026):
8 cars
Design Speed:
80 km/h
Passengers per Hour per Direction (PPHPD):
8400 passengers
Population of New City of Sadra in 2016:
91,863 people
Projected Population of New City of Sadra in 2026 (Horizon Year):
465,770 people
^
The elevated station at the entrance of the New City of Sadra includes a ticket hall, platform, and passenger access to ground level, covering an approximate area of 6,500 square meters. The underground station in the center of Sadra City includes a ticket hall, platform, and passenger access to ground level, covering an approximate area of 7,500 square meters.
^
The initial station of the route is a subway station that is also a joint station with Line 3 of Shiraz Metro. The construction of this station is being carried out by Shiraz Urban Railway Organization.
^
Additionally, the terminal station of the route will be constructed at ground level, facing the largest integrated complex in the southern region of the country, covering an approximate area of 7,000 square meters.